UTILITY CONTRACTOR RENTAL & SALES
toll free 866› 898.7368 contact@msprents.com
About Us Shoring Systems Pump Systems Support Equipment Training Project Gallery Credit Application Contact
If you can dig it, we can keep it safe & dry HomeProject Gallery › Flocculator
PROJECT GALLERY
High Pressure
Pumps 1
High Pressure
Pumps 2
High Pressure
Pumps 3
Enviroprime 1
Enviroprime 2
Shoring
Support Equipment
Training
WellPoints

CASE STUDY :: FLOCCULATOR ››


Challenge: Muddy water is a common problem when repairing a culvert. Getting rid of that water and meeting state regulations used to be the difficult part. Not anymore.

Solution: The Flocculator polymer injection system takes less than 10 minutes to assemble. The predetermined polymer solution travels through the feed tube at a specific rate to a standard dewatering pump. The treated water is then pumped to:
   a) a retention basin for settling and then discharge off site
   b) a Floc Bag which captures the flocculated sediment
       and discharges clean water that meets turbidity
       requirements.
This filter captures the flocculated soil, while the clean water is discharged directly off-site.

More information on flocculator

 
 
 

Atlanta, GA
(678) 888-0333
Charlotte, NC
(704) 344-8081
Greensboro, NC
(336) 856-1997
Raleigh, NC
(919) 788-8181
Knoxville, TN
(865) 691-4933